Subscribe

Subscribe here to our newsletter, alerts and other content.

*
*
*

Conteúdos que deseja receber:

Menu
Saltar Navegação

PROGRAMA OPERACIONAL SUSTENTABILIDADE E EFICIÊNCIA NO USO DE RECURSOS

  • Search
  • Portugal 2020
  • União Europeia
PT
PT
  • PO SEUR
  • Calls for Applications
  • Applications
  • Documentation
  • Media
  • Contacts
  • About the Programme
  • Organization Chart
  • Structure
  • Team
  • Communication and Branding
  • Calls for Applications
  • Approved Applications
  • Search for Applications
  • Completed Projects
  • Documentation
  • State Aid Transparency
  • News
  • Spotlights
  • Monthly Bulletin
  • List Videos
  • PO SEUR Contacts
  • Digital Complaints
  • Spontaneous Job Applications
X

Página Principal

PO SEUR

  • About the Programme
  • Organization Chart
  • Structure
  • Team
  • Communication and Branding

Calls for Applications

  • Calls for Applications

Applications

  • Approved Applications
  • Search for Applications
  • Completed Projects

Documentation

  • Documentation
  • State Aid Transparency

Media

  • News
  • Spotlights
  • Monthly Bulletin
  • List Videos

Contacts

  • PO SEUR Contacts
  • Digital Complaints
  • Spontaneous Job Applications
  • ÁREA RESERVADA AO COMITÉ DE ACOMPANHAMENTO DO POSEUR
  • ÁREA RESERVADA À REDE AMBIENTAL
© POSEUR 2019
  1. Home EN
  2. Calls for Applications
  3. Calls for Applications
  4. POSEUR-12-2016-38 | WS and WP systems closure and less water pollution

POSEUR-12-2016-38

 From 31-03-2016 00h00m to 05-07-2016 18h00m

Call for Applications for operations aimed at closing the water supply systems in low and sanitation systems of waste water and also for operations aimed at reduction of urban pollution in water bodies.

 

See Call for Applications POSEUR-12-2016-38.

 

See Accompanying Documents to the Call:

Annex I – Applications decision process [.pdf]

Annex II - Parameters and Selection criteria [.pdf]

Annex III - Achievement and Result Indicators [.pdf]

Annex IV – Beneficiary elegibility criteria (points b), c) and d) of nº1 article 98.º) [.pdf]

Guidelines I a) – Note on Financial Analysis [.pdf]

Guidelines I b) – EVF Filling Form [editable .xlsx]

Guidelines II – Filling Form for Balcão 2020 [.pdf]

Guidelines III – Documents to include within the application [editable .xlsx]

Guidelines IV – Draft for the Declaration of Compromise [editable .pdf]

Guidelines V – Penalties Simulator [editable .xlsx]

 

Period for submission of applications


Starts: march 31, 2016 | Closes: july 05, 2016 at 18:00


Access Balcão 2020 to submit an application

 

Priority Axis 3

Protect the environment and promote resources efficiency

 

Investment Priority

6.2 | Investment in the water sector to meet requirements relating to the environment and the investment needs in excess of the requirements identified by Member States

 

Specific Goal

Optimization and efficient management of existing resources and infrastructure, ensuring the quality of service to the population and the sustainability of the systems within the Urban Water Cycle

 

Intervetion Type

12 | Urban Water Cycle

 

Section of the Specific Regulation Sustainability and Efficient Use of Resources Domain (RE SEUR)

14 | Efficient Urban Water Cycle Management | Point a) Water Supply (WS) and Point b) Wastewater Sanitation (SAR), both Article 95.º of RE SEUR

 

Call for Applications Synthetic Designation

Operations aimed at closing the water supply systems in low and wastewater sanitation systems; and

Operations aimed at reducing urban pollution in water bodies.

 

See all versions of Call for Applications POSEUR-12-2016-38

Call for Applications POSEUR-12-2016-38 | Version 01 | 2016.03.31

Tweet
Did you find the information you were looking for on this page? Yes No

Help us improve

Help us improve

X

Thank you for your contribution. Follow us on Social Networks.
Contacts
Footer

Rua Rodrigo da Fonseca, 57
1250-190 Lisboa

Telefone: (+351) 2115 45000
Fax: (+351) 2115 45099

poseur@poseur.portugal2020.pt

Useful Links

Contacts Form

Site Map

Terms and Conditions

Privacy Policy

Acessibilidade

RESTRICTED AREA TO THE POSEUR MONITORING COMMITTEE

Site Map

Terms and Conditions

Privacy Policy

© POSEUR 2025