Under Call for Applications/Invitation code POSEUR-12-2015-03 in the field of wastewater treatment and in order to address non-compliance and litigation under the Directive on the Treatment of Urban Waste Water - Directive 91/271 / EEC of 21.5.1991 (DARU) an application was approved that is designed to support the construction of the WWTP of Beja.
This - Call was inserted in the urban water cycle, part of PO SEUR Axis III, which includes the Investment Priority (IP) 6.2 - "Investments in the water sector to meet the requirements of the environmental acquis Union and meet the investment needs identified by the Member States to go beyond these requirements."
All approved applications are listed and can be found in the "Approved Applications tab of the "Applications" menu in PO SEUR website and are available to be researched through various criteria.